The brief was to provide an alternative layout for the main school library, with a book display, storage and wipeable white boards.
The scheme involved working around playground access and a main corridor, allowing for a quiet area and being accessible from 3 entrance points.
The library layout was changed, and we supplied tables to match the fitted units. Storage units followed their “Reading River” layout from Year 1 to Year 6 and overall, we increased storage capacity by 30%.
A pre installation site survey was carried out to ensure we had captured all relevant information. By engaging with the school directly, we were able to capture their requirements, within budget and delivered and installed to their timescales.